After marking out we excavate the site with a JCB
|
|
|
|
 |
 |
|
We vibrate the sub soil before laying the pool base
|
|
|
|
 |
 |
|
The swimming pool base has a criss-cross of 12 mm steel rebar. This guarantees that there is no subsidence
|
|
|
|
 |
 |
|
The walls of the pool are laid with hollow blocks which we line with steel and then fill with concrete
|
|
|
|
 |
 |
|
Once the block work is complete we fit the skimmers, lights and plumbing.
|
|
|
|
 |
 |
|
This technique is a time tested method that gives us the flexibility to build any shape or size pool.
|
|
|