Ron

Jacuzzi Room Update

By |2007-10-18T17:08:20+00:00October 18th, 2007|Ron|

J Room update I will be moving the jacuzzi tomorrow morning first thing. Patio doors will also be fitted.

BBQ Area

By |2007-08-29T13:18:41+00:00August 29th, 2007|Ron|

Pool update and BBQ area. I will put in a wall light and plug sockets either side of the BBQ also the worktop height will allow for you to put in an under counter (beer) fridge if needed.

Swimming Pool Patio Walls Heights

By |2007-08-26T05:13:09+00:00August 26th, 2007|Ron|

The block work is now finished with the exception of possibly raising the BBQ wall, these photos should give you an idea of the finished wall heights, I think we have managed to give some privacy without loosing the views. View from top patio View from bottom patio View from bottom patio when pretending to

Swimming Pool – “looking more like it”

By |2007-08-20T14:26:10+00:00August 20th, 2007|Ron, Under Construction|

The backfill is now in and we have vibrated the soil with a compactor, then laid down a steel mesh with steel reinforcing bars with the screed on top. The picture below has the man pointing out the shower drain to the left of the gate way. I think 4 blocks high around the pool

Swimming Pool Update

By |2007-08-14T15:16:19+00:00August 14th, 2007|Ron, Under Construction|

The walls for the terrace are now in, tomorrow is a fiesta so will backfill on Thursday, then it will start to look like a pool. The block work is seperated every few meters with a reinforced column for added strength this is also connected to the foundations

Swimming Pool Structure finished.

By |2007-08-11T18:19:31+00:00August 11th, 2007|Ron, Under Construction|

Hi Ron, Here are some up to date pictures of the pool. Water was delivered on Monday so work is cracking on again. Water pump is fine. The steel has been put in the pool base and the copper wire for the earth has been soldered to it with two one metre copper spikes driven