Do You Have A Construction Project We Can Help With?
Pool full of water
The swimming pool has been topped up, the fountain works very well and all the pool lights are now working. I have moved the Heat pump and we are running the final checks for everything.
Swimming Pool Finished
The pool is now finished and we are starting to fill it with water. The filter has been filled with sand and we have plumbed in the heat pump leaving plenty of long lengths of tubing for the future instillation
Fibreglassing of the swimming pool
The glassing is now finished. We will tile the pool edge tomorrow and I will start to fill the swimming pool with water this weekend I will also Install the heat pump. The ramp to the garage is also finished.
Starting to fiberglass the pool
The first coat of resin has been rollered on the swimming pool We are about to concrete the driveway entrance
Swimming pool update
Water feature is finished minus the water proofing BBQ area next to the pool Final painting being finished Three different angles of the Jacuzzi room Touching up the painting and the stone wall has been rebuilt The pool has been
Water Feature
The water feature is nearly finnished.