Checking the steel for the foundations before we pour the concrete

The concrete lorry and pump arrive and we start pouring, the concrete is also vibrated to remove any air bubbles.

The foundations are finished for the first villa, the blocks are rendered then sealed to prevent damp. We fill in between the foundations with stone to raise the floor levels.

Steel work is started for the walls then we start shuttering.

The foundations are started for the second villa.