Carpentry update for the Pergola

By |2008-11-20T05:22:28+00:00November 20th, 2008|Carpentry|

LANZAROTE CARPENTERS The pergola is now finished, we have installed the aluminium sliding roof panels and also the roller blinds that act as wind breaks. The Blinds were supplied and fitted by Sol y Sombra S.L. based in Tias Lanzarote they specialise in all types of blinds, awnings and canopies. You can visit their web

Builders Lanzarote – Playa Blanca Project

By |2008-11-15T10:25:44+00:00November 15th, 2008|Current Projects, Hitesh|

Natura Design -Lanzarote Builders We have started to build the internal walls for the second villa and our electrician is installing the plastic conduits, plug and switch sockets for the electrics to be run through at the final stage of building, when the villas are nearly completed.     The plumbing has been installed for

Playa Blanca villa construction update.

By |2008-11-11T16:47:47+00:00November 11th, 2008|Current Projects, Hitesh|

On the first new villa construction we have built the parapets and screeded the roof, allowing sufficient fall for the water to drain away. This is a time consuming process but must be done correctly to ensure that there are no future problems concerning drainage and leaky roofs. It is also very important to finish

Pto del Carmen Resort Rejuvenation

By |2008-11-08T09:09:03+00:00November 8th, 2008|Lanzarote News|

Puerto del Carmen – the hub of both the Lanzarote Property and tourist markets – is about to undergo a major face lift.  As island authorities press ahead with plans to “reinvent” tourism in the resort in a bid to maintain its competitiveness versus other, newer, holiday destinations.  Package tourism on Lanzarote first took off

Pergola – Carpentry by Natura design

By |2008-11-01T10:16:55+00:00November 1st, 2008|Carpentry, Pergolas, Ron|

This pergola has been built from top quality timber, we carefully inspect the grain of each piece of timber before purchasing it for straightness to reduce the chances of the beams bowing over their life time. This is important as practically all timber on the island has been naturally dried therefore it has a very

Electical Instilation

By |2008-10-07T10:06:53+00:00October 7th, 2008|Current Projects, Hitesh|

All the acro props have been removed bar a few and we have started to chop out the walls for the electrical conduits. The Lounge                      The Kitchen      The View from the Kitchen into the sitting room. The view from the lounge into the Kitchen.

Carpentry by Natura Design

By |2008-09-30T10:01:00+00:00September 30th, 2008|Carpentry|

This is a semi shaded Pergola which when completed will have three sliding aluminium louvered  sections to supply shade when required. Made from top quality materials it has been waterproofed with three coats of Bondex, one of Macassar Mate and two of Macassar Satinado and sanded with a fine wet and dry sandpaper between each

Playa Blanca update

By |2008-09-03T10:39:44+00:00September 3rd, 2008|Current Projects, Hitesh|

Quality control department checking the project with his new car.    Roof for the first villa just before pouring the concrete. All the acro props are in place and the steel work has been checked by the quality control.       Roof has been poured and the block work for the second villa is up