Internal and external floor tiles have been fitted on both villas and the external tiles have been grouted. The entrance in the first villa is finished. There is a marble threshold, a ceiling rose in the center of the ceiling

By |Hitesh, Tiling|

Playa Blanca Update

The lower level garden areas are now finished and the top coat of back-fill is used to cover the water tanks and waste pipes. The shuttering has been placed to help protect the stone walls from any falling rocks. We

By |Current Projects, Hitesh|

Playa Blanca Update

The Canarian dry stone walls at the front of the villas are now finished. We have built the stone wall by the swimming pools up to the patio floor levels. We can now finish screeding the outside terraces and start