Do You Have A Construction Project We Can Help With?
Sceeding the floors
We have now finished the screeding in-side and out of both villas ready for tiling.
The Swimming Pools are Started
The final structural part of the project are the swimming pools. We have leveled the base and compacted the soil ready for a thin layer of concrete. This gives us a base to work on. A steel mesh is constructed
Preparing the floor levels ready for the concrete.
The shuttering is in place for the balcony floor off the master bedroom and we are putting in the floor levels ready for the concrete.
Finished off rendering the front walls
We have now finished all the rendering of the front walls for both villas in Playa Blanca.
The Plasterers in Action
In this method of plastering a special plaster is used, it has been designed to set quickly after being sprayed on, it is called Yeso Projeccion or Yeso Rapido. When plastering by hand a slow setting plaster must be used,
An Introduction to Swimming Pool Cleaning and General Maintenance
A vital part of owning a swimming pool is that of its cleaning. It is a commitment you undertake when installing your pool whether you take the responsibility on yourself or hire one of the many professional pool maintenance businesses