Lanzarote builders – New villa update for Playa Blanca
The acro props have been put into position to support the main structure of the ceiling of the basement. All the ceiling blocks are in place. We will finish the final steel work on Monday morning ready for pouring the
Natura Design – Starting to shutter for the basement ceiling.
We have started to put up the shuttering to support the ceiling The preparation for the screeding of the second villas floor The site has been backfilled and the land has been levelled Lanzarote builders
Lanzarote builders Playa Blanca Update
Today we are pouring the final concrete for the completion of the basement walls for the second villa. We will also pour all the supporting columns for the first storey. The technical control and quality control technicians visited the site
Playa blanca build starts to take shape
Things are starting to take shape. We have finished the foundations on the second villa. The concrete has been poured, levelled and then vibrated to take out any air bubbles. 60 cubic metres of concrete have gone into the foundations,
Playa Blanca construction update
The concrete lorry and concrete pump have arrived to start the first section of wall for the basement. We have started with a twenty six metre section of shuttering. The panels are painted with a product to stop them sticking