Do You Have A Construction Project We Can Help With?
Playa Blanca Renovation
The bathroom is tiled and we are now laying the blocks for the bath to sit on. All the internal walls have been filled and painted. Old sky light in shower room has been filled ready for the false ceiling.
Renovation Playa Blanca
We have opened up the doorway for Bedroom 2 and the window in the bathroom. The sky light has been fitted in the bathroom ceiling and we have started repairing the old walls and are painting. I have decided to
Villa renovation
The hot and cold water system is now installed, we have also finished the wast water drainage for the house. The electrical macrons, sockets and switch boxes have been fitted ready for our electrician to run the new wires. We
Electric and Plumbing Instillation
We have chased out the walls and floors and are fitting the boxes and macron for the electric cables. We have finished the wast system for the bathrooms and are currently fitting the hot and cold water systems.
Janet and Peters garden at Casa Fuerte Lanzarote
The garden is now finished, has a pathway through the centre leading to the gate onto the promenade. There are tree types a vine planted, red grapes, white Malvacia grapes and Muscatel sweet grapes. There are three Canary palm trees, four Borganvillas, about
Landscape Gardening Casa Fuerte
A typical Lanzarote Landscape of vines and fruit trees. We have cleared the land and created a split level. The top area will have citrus trees, three orange, three lime and three lemon trees. Above them we will plant some Muscatel grape vines, the locals