Finishing Touches
The garden has been raked and the Picon is in place, the final painting and touching up is finished. The patio tiling is done and the solar panels have been linked to the swimming pool heat exchanger.
The garden has been raked and the Picon is in place, the final painting and touching up is finished. The patio tiling is done and the solar panels have been linked to the swimming pool heat exchanger.
Filling the Swimming Pool with water for the first time, the water was delivered by lorry and took two deliveries. The pergolas are nearly finished and we are grouting the remainder of the tiles at the front of the house.
We have started the fiberglass for the swimming pool and spa, the plumbing for the sand filter is underway, the pergolas are nearly ready for fitting and most of the tiling in the front garden is now finished.
The swimming pools have now been rendered and we are laying the border blocks and the screed for the patios. The patios are reinforced with steel to stop any subsidence. The plumbing for the pools is now finished and things are really starting to take shape.
The swimming pool base has bean laid and the shape of the pool has bean formed. We have run the copper earth wire around the base of the pool and used 4 earthing rods for extra safety. There is a circular splash pool on the nearside with the steps entering the pool on the far
The air-con units have been installed. Finishing of the decorating ready for the kitchen instillation.
We are going to paint and fiber the roofs before the rains arrive this weekend. Kitchen electrics and plumbing being fitted.
The doors have now been fitted and architraves on the frames. Shower floors are finished and we are waiting for the glass walls to be delivered tomorrow. Floor tiles are grouted and the skirting tiles are done.
The BI-Fold doors are in and we are now concentrating on the roof and sky light. The carpenter is fitting the internal and wardrobe doors.
We have just started the kitchen extension. The aluminium doors and windows have been fitted. The carpentry has been delivered and the internal doors are being fitted. Bathroom tiles are now all finished and we have started to tile the floors.