Internal floor tiles
Just finishing off the floor tiles and the last of the skirting tiles. Kitchen fitters will start fitting the kitchen on Monday.
Just finishing off the floor tiles and the last of the skirting tiles. Kitchen fitters will start fitting the kitchen on Monday.
The floor tiles are being laid, we have finished the sitting room and kitchen area ready for the kitchen fitters and are now tiling the bedrooms, Chris has also had his men cleaning and planting behind the house.
Great property in a fantastic see front location, we are carring out a full renovation of the property, new plumbing and electrical instilations, bathrooms, kitchen, turning the main living areas into open plan living and retiling the property inside and out. We have stripped out the old wall tiles in the kitchen and bathrooms, removed
We have started to build the seperation wall for the driveway to the neighbors property and the lower garden areas.
The garden has been raked and the Picon is in place, the final painting and touching up is finished. The patio tiling is done and the solar panels have been linked to the swimming pool heat exchanger.
Filling the Swimming Pool with water for the first time, the water was delivered by lorry and took two deliveries. The pergolas are nearly finished and we are grouting the remainder of the tiles at the front of the house.
Swimming Pool Mosaic Tiles The swimming pool has now had the fibreglass finish applied and painted with Top-Coat. The mosaic tiles are being applied to the waterline for easy cleaning of suntan oils and general dirt. The pergolas main frames are fitted and we start the T & G on Monday. The electrician is installing
We have started the fiberglass for the swimming pool and spa, the plumbing for the sand filter is underway, the pergolas are nearly ready for fitting and most of the tiling in the front garden is now finished.
The swimming pools have now been rendered and we are laying the border blocks and the screed for the patios. The patios are reinforced with steel to stop any subsidence. The plumbing for the pools is now finished and things are really starting to take shape.
The garden layout with the pool, splash pool and spa is really starting to take shape.